Some of the design team are currently putting together a document for the client that will show all of the design process and ideas that were involved with the Soapbox. Other members of the design team are finishing of the construction manual.
Posted 26 Apr 2018 11:32
Some of the construction team are working on the anti-slip flooring this morning. 4 individual pieces need to be cut to side and fixed to the base.
Posted 26 Apr 2018 11:23
Some of the construction team are working on the anti-slip flooring this morning. 4 individual pieces need to be cut to side and fixed to the base.
Posted 26 Apr 2018 11:23
Squad.
Posted 25 Apr 2018 14:17
The final structural component (timber bracing) is being fitted. Hopefully with all of the decretive elements and roof it will start to come to life.
Posted 25 Apr 2018 14:16
The coach screws that fix the stud 'wings' to the pallet base line up perfectly.
Posted 25 Apr 2018 14:15
All components are now on site and we are waiting for our collaborators to arrive so they can watch how it is assembled.
Posted 25 Apr 2018 14:14
The Soapbox is being transported over to site before the engineers come and inspect in later on today. The structure is complete so if everything goes as planned we can start adding the decorative elements that our design team have been working on.
Posted 25 Apr 2018 14:13
The Soapbox is being transported over to site before the engineers come and inspect in later on today. The structure is complete so if everything goes as planned we can start adding the decorative elements that our design team have been working on.
Posted 25 Apr 2018 14:13
The base is complete and the pallets have been reinforced with more timber. The stud 'wings' are now ready to be fixed to the base.
Posted 24 Apr 2018 23:15
The test run of the base went smoothly. The ply has been fixed to the pallets however minor amendments will need to be made tomorrow to ensure the platform is level.
Posted 23 Apr 2018 16:31
The design team are working in two teams today. One team is working on the pallet connection system whilst the other works on measuring and cutting the plywood that will be fixed to the pallets.
Posted 23 Apr 2018 14:46
Designing a system that gives the base stability and is easy to fix together.
Posted 23 Apr 2018 14:44
Brackets have been added to add stability and rigidness to the 'wings'. 60 angled brackets have been fitted so far! A few more to go...
Posted 20 Apr 2018 16:30
Using the first stud 'wing' as a template for the second. Another sunny morning!
Posted 20 Apr 2018 16:29
The remainder of the materials arrived this morning and work began on the second of the two stud 'wings'.
Posted 20 Apr 2018 16:28
Progress snap of the stud 'wing' being constructed.

So far all of our measurements are correct and everything is fitting together as planned.
Posted 19 Apr 2018 14:56
Progress snap of the stud 'wing' being constructed. Coming together nicely!
Posted 19 Apr 2018 14:55
I think we need a bigger car.

Thankfully we were able to get them delivered the following day instead! The majority of the materials have arrived and the remaining are on schedule to arrive tomorrow.
Posted 19 Apr 2018 14:41
The students have been split into two groups. One half of the team will be constructing the Soapbox whilst the other half will be putting together a construction manual and leading the design for the perspex panels.
Posted 19 Apr 2018 14:30
Making the most of the rare Manchester sun and checking the Sketchup model before construction starts tomorrow.
Posted 19 Apr 2018 14:29
Some final preparation before we start the build! This afternoon we met with our collaborator and took the pallets over to the site to ensure they were happy with the proposed location for the Soapbox.
Posted 19 Apr 2018 14:29
Our design process is under way!

A really positive first meeting with some of our team! We now have a solid concept that we can develop before we meet the engineer next week.
Posted 8 Mar 2018 17:34
Our design process is under way!

A really positive first meeting with some of our team! We now have a solid concept that we can develop before we meet the engineer next week.
Posted 8 Mar 2018 17:34
Meet the Team.

Name: George Kesek
Graduated from: Liverpool John Moores University | 2014
Experience: KSR Architects, Shenzhen | Donald Associates, Chester | Aspect Studio, Melbourne
Atelier: MSAp
Interests: I have a passion for travelling and since graduating in 2014 I have been able to combine that with architecture by working in practices in three different continents.
Posted 8 Mar 2018 14:59
Site Visit | Option 4

After meeting with our collaborators we have been to the site to identify possible locations for the Soapbox. We will discuss these options further in our design session and talk about the feasibility of each option.
Posted 8 Mar 2018 14:37
Site Visit | Option 3

After meeting with our collaborators we have been to the site to identify possible locations for the Soapbox. We will discuss these options further in our design session and talk about the feasibility of each option.
Posted 8 Mar 2018 14:34
Site Visit | Option 2

After meeting with our collaborators we have been to the site to identify possible locations for the Soapbox. We will discuss these options further in our design session and talk about the feasibility of each option.
Posted 8 Mar 2018 14:33
Site Visit | Option 1

After meeting with our collaborators we have been to the site to identify possible locations for the Soapbox. We will discuss these options further in our design session and talk about the feasibility of each option.

Posted 8 Mar 2018 14:29
Hi group 12!

After meeting with our collaborators last week and visiting the site we have started brain storming initial design ideas for the Soapbox.

It is now the time to start thinking about what this soapbox may be? Will it be physical? will it be virtual?

We want you to help us - We want your ideas!

We are currently in the process of organising a design session where we can discuss these ideas to see what's feasible. We will be discussing these ideas with our collaborators to ensure we meet all requirements from their behalf.

We will be posting some precedents on this blog to hopefully get your creative minds going but feel free to send us your ideas via email!
Posted 27 Feb 2018 17:13