skip to content | Accessibility Information

Alexander G

Group 11 MIF

We like numbers:
Gross internal floor area = 35m2
Construction cost = £560
Construction cost per m2 = £16/m2
Value.
Posted 5 Apr 2017 18:21
The team celebrates finishing the frames and the prospect of some post-work refreshing beverages.
Posted 3 Apr 2017 22:55
We have conducted several wobble tests and left them overnight but they remain standing. Relief.
Posted 3 Apr 2017 22:40
The final section of frame being connected to the rest of the structure.
Posted 3 Apr 2017 22:34
The Big Erection. The whole team was needed to lift the frames into place while our professionally trained ladder climbers connected the beams that hold them together.

This is the moment we realised how big it was actually going to be and began a search for longer ladders.
Posted 3 Apr 2017 22:32
The structures comprise of 70 timber planks each which all had to be sanded, drilled and layered up in the correct sequence with the correct size threaded rod connections at each junction. (Our 'modular' system somehow proved remarkably complex). With limited time to complete we had to get both structures on the go at the same time but the undergrads had the confidence to work independently and had the structures ready for erection in no time at all.
Posted 3 Apr 2017 22:24
Threshold Festival have tasked us with building two enclosed spaces to display art installations and hold theatrical performances. We had a modest budget and two and a half days on site to complete construction before the festival kicked off on the Friday. Here we are explaining the design and construction sequence to the undergrads in the cafe at the Northern Lights warehouse venue where some of the festival takes place.
Posted 3 Apr 2017 22:14
With the MIF work finished for the Events weeks we travelled over to Liverpool to start on our next temporary festival project for Threshold Festival. Here we are having a look around Albert Docks, the Baltic Triangle and the derelict Cain's Brewery on Wednesday morning.
Posted 3 Apr 2017 14:09
The 'Timber Frame' group being introduced to the MIF board, festival organisers and designers from OH OK, Ferrious, EXYZT and Practice Architecture. The guys weren't fazed and produced a confident and surprisingly energetic performance. MIF have been in touch to confirm their desire to develop and realise a couple of the designs with the undergrads in the run up to the festival in June.
Posted 3 Apr 2017 11:57