skip to content | Accessibility Information

Good feedback from Yumian; she thought the events week was really informative and interesting!
Posted 30 Apr 2018 16:38
Yiling had a great time! She enjoyed the design aspects and the assembly of the project!
Posted 30 Apr 2018 16:38
Sin really enjoyed working on the festival project and the design elements of the overall project where the students pitched their own proposals to the collaborator!
Posted 30 Apr 2018 16:37
Really good feedback from Simona, she found the 1:1 installation a really engaging project to be apart of!
Posted 30 Apr 2018 16:34
Mohamed was really interested working in a more art driven project as opposed to building based projects!
Posted 30 Apr 2018 16:26
Maria found it great experience working with a more construction driven project!
Posted 30 Apr 2018 16:24
Great Feedback from Leyli, she really enjoyed being involved with the assembly of the installation at a 1:1 scale!
Posted 30 Apr 2018 16:22
Fabricator Phil delivered the structural frame today, freshly powder coated and looked crisp!

The morning was spent marking up the spider joints and struts to make sure they fitted together perfectly. Holes along the specified struts were also marked out to allow for the further additions to the frame.

A superb start to the week!
Posted 23 Apr 2018 19:10
Getting the guys to develop and experiment using both hand-drawings and physical models really helps to understand what is being proposed!

Really looking forward to see how their inputs fit into main frame and design - Excited for next week!

Cheers!
Posted 21 Apr 2018 15:37
Candid snapshot of the guys working hard developing their personal designs!

Really looking forward to see how their inputs fit into main frame and design - Excited for next week!

Cheers!
Posted 21 Apr 2018 15:33
Great meeting with our client earlier this week!

After taking our approved final scheme forwards, we have began resolving its means of construction! This has been a carefully considered process that takes into account the installation within the university as well the at the festival. The agreed approach has been to create a durable, lightweight and easily adaptable structure that enables a playful assembly of neon cord that will resemble the Big Bang!

Having now resolved the structure through technical drawing and modelling it will now be in the hands of our manufacturer who will look to bring our idea into reality!
Posted 13 Mar 2018 20:05
Great meeting this week with our Client from Decordia!

She was very excited to see all of our fantastic ideas! The final design will now be taken forward to the rest of the Decordia team!

We will now be looking to develop the design and provide an idea on cost, material and how it will be manufactured!

We are hoping the students that will be working with us in Events will contribute to the design in their own unique way! It will be a very exciting couple of weeks!

Cheers!

Posted 22 Feb 2018 10:50
Managed to book our space for Events!

We shall be installing the scheme in the Benzie building over the course of the events programme! It will be a fantastic opportunity for people to engage with the event and interact with everyone involved!

Can't think of anywhere better!
Posted 14 Feb 2018 18:07
Thanks to everyone that made the Events Presentations last week!

We are looking forward to meeting everyone that wants to be involved in the project!

Cheers!
Posted 5 Feb 2018 19:02