skip to content | Accessibility Information

Posted 29 Apr 2016 18:40
Posted 29 Apr 2016 18:40
Posted 29 Apr 2016 18:39
Posted 29 Apr 2016 18:39
Posted 29 Apr 2016 18:39
Posted 29 Apr 2016 18:39
Internal presentation
Posted 29 Apr 2016 18:38
Presentation with events manager at Manchester cathedral, an interactive installation
Posted 29 Apr 2016 18:38
'I wish we could have a Manchester school of architecture month to present all these good works' Manchester cathedral events manager
Posted 29 Apr 2016 18:36
Proposing a bio morphic coin collection installation
Posted 29 Apr 2016 18:35
Posted 29 Apr 2016 18:35
[Day 04] Model Making
Posted 29 Apr 2016 17:16
[Day 04] Discussion
Posted 29 Apr 2016 17:15
Day 04_Discussing the design of the conceptual corner - the structural grid and fabric covering.
Posted 29 Apr 2016 17:01
Day 04_Reviewing the lasercut files for each of the corners of the model of the Lee House buidling.
Posted 29 Apr 2016 17:00
Great start in the workshop today, looking forward to seeing the final outcomes at the exhibition on the 10th may at the craft centre!!!
Posted 29 Apr 2016 16:52
Day 5
Reviewing clips from the day's filming session
Posted 29 Apr 2016 15:49
Hard at work...
Posted 29 Apr 2016 15:43
Kite Testing for White Nancy Wrapping
Posted 29 Apr 2016 15:42
Day 4_ Building digital model (Group 2)
Posted 29 Apr 2016 15:36
Day 4_Adding elements such as furniture into site model (Group 1)
Posted 29 Apr 2016 15:34
Day 03_Discussion on the process of designing the conceptual corner on the facade of the unbuilt part of the Lee House building.
Posted 29 Apr 2016 15:26
day 4 _ model assembly
Posted 29 Apr 2016 15:23
Day 03_Going over all initial drawings of facades of the Lee House building, and their potential layering for a physical model.
Posted 29 Apr 2016 15:22
Day 03_Discussion and division of all preparatory work for the physical model to be undertaken.
Posted 29 Apr 2016 15:21
Posted 29 Apr 2016 15:15
Posted 29 Apr 2016 15:15
Posted 29 Apr 2016 15:14
Lighting I Mirror I Reflection
Posted 29 Apr 2016 15:13
Material perceptions
Posted 29 Apr 2016 15:05
1 of 3 module structure completed!
Posted 29 Apr 2016 15:03
Photoshop workshop
Posted 29 Apr 2016 14:26
Projecting ideas. Development and testing of installation components
Posted 29 Apr 2016 14:25
Cross group reviews to refine and analyse ideas
Posted 29 Apr 2016 14:24
Day 5 / Filming scene 2 / Take 3
Posted 29 Apr 2016 14:21
Day 04 | String Form
Posted 29 Apr 2016 12:53
Day 04 | Developing String Forms
Posted 29 Apr 2016 12:50
Day 05: Creating visualisations for the store design
Posted 29 Apr 2016 12:49
Day 05: Designing events posters to celebrate Manchester music at the O2 concept store
Posted 29 Apr 2016 12:48
Day 05: Researching shop installations
Posted 29 Apr 2016 12:44
Informal peer reviews. Everyone showed their ideas and got very valuable feedback, ready to carry on working on Tuesday.
Posted 29 Apr 2016 12:30
Day 3 - Disassembling Pallets
Posted 29 Apr 2016 12:22
Day 3 -
We held a design charette in two teams to discuss a design for the pallet green wall based on our previous site investigations. This meeting was disrupted by having to relocate. Everyone drew a proposed elevation which we then discussed as a group, subsequently allowing us to develop a proposed design for the green wall which was an amalgamation of our discussion.
Posted 29 Apr 2016 12:21
Day 3- Testing positioning of the pallet on site
Posted 29 Apr 2016 12:19
Day 3 - Sharing is caring
We then had a discussion with Dave, the local tradesman who offered his skills to us to demonstrate how to fix the pallets onto the brick wall. This was our chance to exchange building knowledge’s which we identified as one of the aims of our event. He informed us about the need for a DPM to be fixed between the wall and the pallets, as well as the appropriate screws to use on the fixings.
Posted 29 Apr 2016 12:15
Conceptual model completed (group 2)
Posted 29 Apr 2016 12:04
Day 3 - Why does it always rain on me
Today we were all based on site at the miner’s, working with the pallets we acquired yesterday. We started the day with another delivery of 20 bags of soil from Anwar, so it was all hands on deck to unload the van. Then we had to catalogue the pallets and split them into useable whole ones and ones, which were rotted that, were to be cut up for parts, so then the team set out dismantling these pallets.
Posted 29 Apr 2016 12:02
Conceptual models completed. (Group 1)
Posted 29 Apr 2016 12:02
Students creating conceptual models to understand the spatial boundaries.
Posted 29 Apr 2016 12:01
Day 4: Painting Underway
Posted 29 Apr 2016 11:58
Students starting conceptual designing and researching hydroponic systems to incoporate into their allotment design.
Posted 29 Apr 2016 11:55
Students starting conceptual designing
Posted 29 Apr 2016 11:54
Learning Illustrator and InDesign today!
Posted 29 Apr 2016 11:49
Skjolden itinerary
Posted 29 Apr 2016 11:46
Squire and Partners - The Sheep installation in Brooks Brothers Regent Street
Posted 29 Apr 2016 11:37
Day 4: Starting to sand down chairs in the Workshop
Posted 29 Apr 2016 11:37
Day 3: Design Charrette discussions with Catherine from Southway at Westcroft Community Centre in Burnage
Posted 29 Apr 2016 11:32
Presentation by Leigh on various precedents for shop installations. A particular favourite being the Brooks Brothers window installation by Squire and Partners.
Posted 29 Apr 2016 11:31
Day 2: Scanned Design Charrette Drawings
Posted 29 Apr 2016 11:30
Day 1: Scanned site Visit Drawings
Posted 29 Apr 2016 11:27
Day 04 | Compendium of Knowledge | Guidelines for creation of a narrative for the competition
Posted 29 Apr 2016 11:27
Day 04 | Compendium of Knowledge | Brief and structure for final presentation of the week
Posted 29 Apr 2016 11:22
Ghostly silhouette made of Perspex of the Santa Tecla Milan, with the exiting duomo behind.

Model Ref. David Eccles. Jenny Etheridge
Posted 29 Apr 2016 11:06
Back in the warmth of the library for our final session of week 1. Donna, who helped in-situ with drafting their Arts Council Funding bid, popped in to check on our progress.
Posted 29 Apr 2016 10:53
Bye-bye Trawden Camping Barn! It might have been freezing outside, but it was definitely worth it for the group photo!
Posted 29 Apr 2016 10:49
It might be a treacherous journey to the library... but it does look beautiful!
Posted 29 Apr 2016 10:48
29th April. After 3 days of sun, clouds, hale, storms, light snow... a blizzard was definitely on the cards!
Posted 29 Apr 2016 10:46
As part of their work with the local community, in-situ organises each month a screening of a different movie, each time in a different location. We joined them at Jim's Vegetarian Restaurant for a screening of the fantastic 1987 British movie 'Withnail & I', with Paul McGann and Richard E.Grant.
Posted 29 Apr 2016 10:43
Heavy hail back at the barn.
Posted 29 Apr 2016 10:36
Working in the archives (MMU) with the Edgar Wood drawing of the Lee house (by H.Sellers) and recreating 2D drawing from perspective watercolour.
Posted 29 Apr 2016 10:35
Nour is tired after all of the hard work today.
Posted 29 Apr 2016 10:31
Dom and Jessie led them to figure out how to present 'introduction' space in the Art Gallery
Posted 29 Apr 2016 01:03
experiment for the 'light tube'
Posted 29 Apr 2016 00:58
Posted 28 Apr 2016 21:20
Trying out the interactive features at children's library
Posted 28 Apr 2016 21:20
Central library's children's library
Posted 28 Apr 2016 21:18
Precedent study to examine alternative approaches in the use of fabrics to create space.
Posted 28 Apr 2016 21:12
Diagrammatic plan of the site, using lights (suspended at varying heights) to lead individuals throughout the space.
Posted 28 Apr 2016 21:10
Site 3D exploring the use of varying heights and spaces between post, to create a semi-transparent space.
Posted 28 Apr 2016 21:05
Design development through modeling, exploring the use of fabrics to define specific spaces.
Posted 28 Apr 2016 21:01