Day 6. 20/05/2015
Assembled construction at its finest, placed in front of the Birley Campus.
Posted 22 May 2015 01:02
Day 6. 20/05/015
We added several colors to water so we can fill the rest of the plastic bottles and make a colorful roof.
Posted 22 May 2015 00:59
Day 5. 19/05/2015
We assembled the construction and thrilled little holes in the lids of the plastic bottles through which we passed a wire, so that we can attached them to the roof.
Posted 22 May 2015 00:52
Day 4. 18/05/2015
We attached the wheels and all the other little bits together.
Posted 22 May 2015 00:47
Day 3. 13/05/2015
We did our first attempt to build up the construction, then we thought of what more we need so that we can make it more stable and easily moveable. We decided to order more materials like wheels, bamboo sticks and etc.
Posted 22 May 2015 00:43
Day 3. 13/05/2015
After we did rough sketches of the construction, we gathered the materials, which we needed to start building it. We collected plastic bottles from the recycle bin and ordered pallets.
Posted 22 May 2015 00:39
Day 2. 12/05/2015
Precedents, which led to our final idea of the project.
Posted 22 May 2015 00:25
Day 2. 12/05/2015
On this day, we sorted out what could be done in order to improve the site. We shared our opinion about the issues and the students' needs. Everyone looked up at some precedents, gave their ideas and we finally concluded what we are going to do.
Posted 22 May 2015 00:17
Day 1. (11/05/2015)
My first thoughts of the site were that the area is environmentaly friendly and many accessibility roads with All Saints and the Oxford Road.
Posted 12 May 2015 23:53
Day 1. (11/05/2015)
We visited our site for the event, which is Birley campus. After exploring it we exchanged our first impressions of it and initial ideas of making the area a better place for students, staff and locals.
Posted 12 May 2015 23:24