This is the final physical model with four individual facades at the bottom, and our presentation board containing our concept and working process.
Posted 22 May 2015 13:48
Day 6
Day six was an easy going day as we completed the physical model the day before, in day six we started to complete the idea behind this whole model. So we added the people that we were trying to show they were a good community and they all had a good friendship with each other which the CPO has ruined because they had get separated and leave the place and go to another area to live in.
Posted 21 May 2015 13:21
Day 5 (Workshop)
In day five we started leaser cutting the pieces for the physical model and started to figure out how to put everything together as we have planned the day before. We also faced some problems with leaser cutting which was we ended up leaser cutting the wrong side of the piece of wood. When we overcome this problem then we started to think about the materials that we use for putting everything together and keep everything neat and clean. We also thought about using hinges to attach the four different parts which shows different types of buildings.
Posted 21 May 2015 12:53
Day 4
In day four we decided to complete our idea of creating a college showing different ideas on the same piece but we also thought that we should come up with a physical model that would show our response to the CPO site. We spent the whole morning thinking of a way to show the response and the afternoon getting everything ready such as the auto cad file etc.
Posted 21 May 2015 12:32
Day 1
As we were not sure of what CPO (Compulsory Purchase Order) means, we were asked to do a little research about CPO and what it meant. After that we were asked to choose a CPO site in manchester and do a full analysis plus a response to that specific site. We chose West Gorton to focus on as it was an area that the council keeps making decisions about doing a CPO on every two or three decays.
Posted 18 May 2015 12:26
Day 3
After choosing the site in day 1 and visiting it in day 2, in day 3 we have decided what would the final output will be which is a photo collage of people and buildings of the area. so this image shows the begining of the process and we are experimenting with different photos that we took from the site.
Posted 14 May 2015 19:38
Day 2
Visiting the CPO site that we chose to work on for the Adverse Space group. After reaching the site all the impression that I had of it from researching about it on the internet changed completely and it was the opposite of what I though.
Posted 13 May 2015 12:39