Exterior part of finish model. A close up image showing the light effects and hanging chairs.
Posted 22 May 2015 00:01
Day 6
Final Model completed in time for the presentation. Overall had a wonderful time building the model with my group mates and it came out well.
Posted 21 May 2015 22:14
Day 6
Made progress with final model. Today was basically a full work day on the final model and presentation for the upcoming day.
Posted 21 May 2015 03:28
Day 1
On the first day we were all introduced one another and had a short brief about the event. After lunch we went to Z art Gallery for a site analysis. We were brought on a tour around the building before entering the gallery spaces. We were given information about the gallery and after that we spent our time measuring the spaces on the site
Posted 18 May 2015 21:55
Day 2
After our site visit, with all the information obtain. We started making Plans, sections and diagram on 1:50 scale which would be helpful on the process on redesigning the gallery space.
Posted 18 May 2015 21:53
Day 3
We had a short presentation on our precedent on how we want to approach to redesign the gallery. We were given feedback by Year 5 to focus on and developed from the precedent we showed.
Posted 18 May 2015 21:51
Day 4
We had to present our proposal concept to the Client from Z art Gallery spaces. After everyone presenting our proposal, we got feedback by our Clients and Year 5. By the end of the day we had been divided into groups to combine different proposal into one. Model during the presentation was one of the successful ways due to it was easier to show and explain the concept.
Posted 18 May 2015 21:48