On Thrusday ( 21.05) We met for last time before the presentations to set up our instalation on the site ( under the stairs of Benzie Building on the Ground floor). Once we isntalled it we were pleased to see that the instalation was working and the people were actually interacting with it.
Posted 22 May 2015 09:14
On Wednesday ( 20.05) we met again to sort out the final design of our instalation, what exactly we are going to project, and to set it up one last time as well as experiment with what other materials we could use as surfaces for projecting. We also came up with the idea of having two extra cubes hanging from above to enhance our scheme.
Posted 22 May 2015 09:11
On Monday (18.05) we started with each group presenting our work so far. After we looked at more precedents our group finalized our idea as we decided to project different videos on each plane of a composition of boxes creating the effect of transgression. After watching some tutorials we built up the composition and started experimenting with the projector and the boxes projecting different videos. After we learnt how to use the software we started recording our own videos showing the movement in different spaces in Chatham.
Posted 19 May 2015 01:03
The third session on Friday (15.05) was drop in session. After having our tutorial with the coordinators we changed our idea and instead of projecting people`s footsteps and at the same time projecting live stream their actions for them and the people around to see and have fun we decided to make it more interacting by projecting a game that people would be able to play on the floor like a touch screen and at the same time still projecting their reactions.
Posted 19 May 2015 00:52
On Wednesday (13.05) all groups presented their ideas. As our group had a few we managed to narrow it down to 1 and after the presentations we continued working to develop our design.
Posted 19 May 2015 00:42
At the first session of the events - 11.05 - Monday, we wre introduced the brief for our event. After giving us the schedule for the next 2 weeks we were split into groups and started working. We had to look for a site for our instalation and to come up with initial ideas of what we are going to do.