Post-completion we walked the structure down to the University of Manchester Students Union.
Posted 22 May 2015 11:32
Measuring the purlin lengths. We had a few issues with the natural bending of wood.
Posted 22 May 2015 11:31
The CNC sheets during production.
Posted 22 May 2015 11:31
Sean the grasshopper Lyon adjusting the CNC sheet layout. It took just over a day to cut the 8 exterior ply sheets.
Posted 22 May 2015 11:30
Plastic hunting for DJ booth facades.
Posted 14 May 2015 11:14
The proposal meeting was with multiple members of Manchester students union and the Pangea organisation team. We pitched our concepts to the staff and answered there questions regarding the design.
Posted 13 May 2015 12:49
The initial model developed into this refined frame. It looked at using string instead of the timber. The string could be illuminated to create a vanishing point perspective.
Posted 13 May 2015 12:44
My initial proposal for the Pangea DJ booth. It looked at covering the DJ with a series of parabolic curves. In this case it was timber.
Posted 13 May 2015 12:42