skip to content | Accessibility Information

DAY 6.
The final day in the events was to place the installation on Birley Campus to see peoples reaction. People have been interested and curious about the design.
Posted 22 May 2015 16:46
DAY 5.
Day 5 was very interesting as we were assembling the whole installation not knowing if it would or wouldn't work.
Posted 22 May 2015 16:44
DAY 4.
In our group we have tried different techniques with different materials and layouts to see what works best.
Posted 22 May 2015 16:42
DAY 3.
During day 3, we have been collecting materials in separated groups which were bottle team, plant team and construction team.
Posted 22 May 2015 16:40
DAY 2.
On day 2 we have looked at different precedents and we analised the site. At the end we came up with ideas for the installation.
Posted 22 May 2015 16:37
DAY 1.
We have visited the site which is MMU Birley Campus and we have explored the area around the Campus.
Posted 22 May 2015 16:33